Every year Historic England produces a health-check of England’s most valued historic places and those most at risk of being lost forever as a result of neglect, decay or inappropriate development.
The list includes buildings and monuments that are at risk of falling into disrepair through disuse or inappropriate development.
Here are 14 buildings and monuments across Wakefield, Pontefract and Castleford that are on Historic England’s Heritage At Risk Register 2023.
Some of the pictures are of the general area of the landmark for illustrative purposes.

9. Whitwood, Wakefield
The conservation area is in poor condition and is described as "deteriorating." Photo: Google Maps

10. Bridge and medieval gateway at Walton Hall, Walton
Water gate, said to be medieval. Roughly-dressed well-coursed masonry largely overgrown by ivy. Central segmental archway with inner recess for doors leads to flight of seven stone steps. Flanking turrets, from one of which it is said Oliver Cromwell fired the first swivel-cannon gun in England. The whole is surmounted by large carved wooden crucifix. The arch is in poor condition and a heavy growth of ivy conceals much of the structure from view. The bridge, which forms part of the Scheduling, is not at risk. Photo: © Historic England

11. Newland Preceptory, Normanton
The Newland Preceptory falls uder the Heritage Category: Scheduled Monument. There are extensive significant problems with the principal vunerability the scrub/tree growth. Photo: Google Maps

12. Sharlston Common coal and ironstone workings
The Sharlston Common coal and ironstone workings is desvribed as "generally satisfactory but with significant localised problems" with the principal vunerability the vehicle damage/erosion. Photo: Google Maps

